CALIBER.xyz
Telegraph Season I

A season thesis, not a weekend toy

Every phase depends on the last. Track 1/2 (Miner+Script) close Aug 31, 2026; Track 3 apps Aug 31-Sep 7 (portal rules).

Phases

H1 → H3

H1$5k

Miner + Script · YAML · registry · x402

Miner/Script Aug 31; Apps Sep 7

  • Lock vertical + labeled eval path
  • YAML Standard draft (v1 schema)
  • TRUTHPORT detector + local miner server
  • GRADELOCK Brier + adversarial + WASM build
  • MinerRegistry on Base
  • x402 payment path exercised
  • Import RAID holdout sample
  • Public HTTPS base_url for YAML
  • registerWasm on Base Sepolia
  • Public build posts on X
H2$10k

Harden grader · apps pull the miner · public proof

mid-October

  • Grader hardening on RAID holdout
  • First external app pulls the miner
  • Demand app that only works via miner
H3TBD

Mainnet consumption · vertical as paid agent intent

Dec 2026+

  • Mainnet consumption live
  • Hosted vertical API